Yuma – Casa Grande Highway / I-8 Araby Road T.I.

Client

ADOT

Location

Yuma, Arizona

Delivery

Heavy Civil

Cost

$8.40M

Date Completed

November 2018

AWARDS

  • Arizona AGC – 2020 Build Arizona Project of the Year – Public Reconstruction: Under $10M – Highway Construction

DESCRIPTION

This two-phased project, funded by the FHWA Highway Safety Improvement Program, resolved significant existing traffic management challenges and won the 2019 Arizona AGC Build Arizona Project of the Year Award based on exceptional partnering and the quality construction of an intricately designed roadway and highway corridor.

The project involved constructing two new dual-lane roundabouts at the intersection of I-8 and Araby Road (SR 195) as well as associated reconnections to I-8 ramps and Gila Ridge Road. To meet the unique constraints and traffic management challenges found on the north and south side of I-8 and Araby Road, ADOT utilized an innovative design featuring dual lane roundabouts with the inclusion of two Diamond Interchanges with U-Turn pockets. The six-way roundabout on the south side of I-8 was a first of its kind in Arizona.

PRECONSTRUCTION SERVICES

Banicki developed detailed maintenance of traffic (MOT) plans to ensure existing traffic flows through the project corridor weren’t reduced at any point during construction. We also performed extensive business outreach and coordination during preconstruction. Araby Road is a vital artery for trucking and the project site was surrounded by numerous major business stakeholders (RV World Distributer, T&A Produce, APS’s Yuma yard, two Circle K’s, Chevron, and others), thus our Project Team worked with these businesses to ensure impacts were minimized through the development of detailed MOT plans and phasing. The MOT plans required extensive planning and coordination to preserve existing traffic flows, maintain access / egress to all businesses, and accommodate the large / wide loads of agricultural equipment moving through the site regularly.

UNIQUE STRUCTURAL SCOPE

  • 9,500 SF soil nail supported retaining walls
  • 14,000 SF cast-in-place retaining walls

UNIQUE CIVIL SCOPE

  • 72,500 CY of roadway and drainage excavation
  • 3,500 LF of 18” to 36” RCP storm drain
  • Over 2.5 miles of curb and gutter
  • 11,700 tons of AC pavement
  • 856 SY PCCP
  • ITS and signalization work