West Air Cargo Reconstruction

Client

CITY OF PHOENIX AVIATION DEPARTMENT

Location

PHOENIX, ARIZONA (PHX AIRPORT)

Delivery

Aviation

Cost

$23.96M

Date Completed

October 2024

DESCRIPTION

Delivered at best value for the City of Phoenix Aviation Department, this major airfield paving project involved the complete reconstruction of the West Air Cargo (WAC) apron area at Phoenix Sky Harbor International Airport (PHX). To maintain uninterrupted PHX airside cargo and parking operations, the project was constructed in four carefully planned phases to mitigate impacts on PHX operations.

The scope included 87,654 SY (18.11 acres) of 19” thick P-501 PCCP aircraft apron, installed through 71 machine placements. All placements were slip-formed using automated total station technology for precise grade control and superior quality, marking the first use of this wire-free technology at PHX. All work was conducted within an active airfield operations area, with PCCP placements performed at night to prevent disruptions to airside gate operations.

SCOPE

  • 87,654 SY (18.11-acres) of 19” thick P-501 PCCP aircraft apron
  • 96,081 SY of P-209 ABC
  • 64,437 CY of excavation
  • 94,762 SY of full depth AC pavement removal
  • 81,178 LF of saw & seal compression joints for P-501 PCCP
  • 53,894 SF of airfield pavement markings
  • 4,004 TN of P-403 AC vehicle service road (VSR)
  • Storm drain inlets & manholes
  • FAA communications manholes
  • Taxiway edge lighting & circuits
  • Apron edge lighting & circuits
  • Temporary airfield lighting circuit jumpers
  • 100’ tall, 1200 W LED luminaires
  • 7,172 LF of concrete & slurry encased electrical conduit & conductors