Beale Street Streetscape Revitalization CMAR

Client

City of Kingman

Location

Kingman, Arizona

Delivery

Heavy Civil, CMAR

Cost

$7.25M

Date Completed

May 2024

AWARDS

  • 2024 Arizona Revitalization Project of the Year by Phoenix Magazine
  • 2024 ACEC Arizona Engineering Excellence Awards Honor Winner
  • 2024 ACEC Arizona Engineering Excellence Awards Best Project Winner
  • 2024 Andy Award Most Improved Commercial Property of the Year

DESCRIPTION

Performed for the City of Kingman, this high-profile CMAR project encompassed the complete reconstruction and beautification of downtown Beale Street from 1st Street through 6th Street. The project’s improvements also included the reconstruction of four intersections on Beale Street. As a prominent tourist attraction for Kingman, with over 40 businesses along the project corridor, Banicki meticulously coordinated with all businesses to maintain unimpeded pedestrian access throughout all phases of construction, utilizing pedestrian barriers and ADA-compliant walkways.

VALUE ENGINEERING

To ensure the full scope of improvements could be constructed within budget, Banicki partnered with the City of Kingman and designer WSP to implement 38 significant value engineering initiatives during preconstruction. During preconstruction, Banicki collaborated with designer WSP and all utility owners to mitigate 22 utility clashes identified at the 60% design stage. We successfully redesigned the intersection curb return geometry and irrigation lines to eliminate all underground utility relocations, requiring only the relocation of two overhead power poles for the entire project.

SCOPE

  • Full reconstruction (building façade to building façade) and beautification across four blocks of Beale Street
  • 18,395 SY new full depth AC pavement
  • 18,395 SY subgrade prep
  • 25,016 SY full depth pavement removal
  • 44,315 SF sidewalk removal
  • 80,407 SF new sidewalk
  • 6,374 CY earthwork
  • 9,543 LF new curb and gutter
  • Architectural colored concrete sidewalk
  • Exposed aggregate colored concrete sidewalk
  • Stained concrete sidewalk
  • Irrigation systems
  • ADA ramps
  • 473 each 5-gallon shrubs
  • 76 each decorative trees
  • Ornamental streetlights
  • Electrical conduit and conductors
  • New sanitary sewer main.