Projects
Heavy Civil
Aviation
Structures
CMAR
Design-Build
JOC
Featured
Company
About
Leadership
Sterling
Safety
Careers
News
Updates
Awards
Services
Contact
Subcontractor Portal
Projects
Heavy Civil
Aviation
Structures
CMAR
Design-Build
JOC
Featured
Company
About
Leadership
Sterling
Safety
Careers
News
Updates
Awards
Services
Contact
Subcontractor Portal
Projects
ALL PROJECTS
Heavy Civil
Structures
Aviation
CMAR
Design-Build
JOC
Featured
Airport Road TI UP (New JW Powell Blvd Bridge)
West Air Cargo Reconstruction
Schultz Creek Drainage Improvements at US Highway 180 CMAR
Bursera Park Trailhead Parking Lot
Stardust Trail Road Widening & Reconstruction CMAR
SR 287 & 79B Dual Roundabouts
Meridian Road – Queen Creek to Germann
Carefree Hwy & 32nd St Intersection
Beale Street Streetscape Revitalization CMAR
MC 85 & 91st Ave Intersection: 95th Ave to 87th Ave
Schultz Creek Crossing – Mount Elden Lookout Road
OMC Guard House & Shade Canopy
Back O’ Beyond Low Water Crossing Improvements
Solano Park Skate Plaza
SRP Civil & Drainage Improvements, Phase 1-4 Design-Build
Paradise Lane at Skunk Creek
El Mirage Roadway Reconstruction
Bloody Tanks Wash Channel Rehabilitation
Avondale Bus Stop (Van Buren & Links)
Fare Collection System Modernization (FCSM) Site Development: Work Packages #01 – #04
Hermosa Drive UP Bridge
North Gateway Transfer Station
Ancient Trail Reconstruction
Buckeye Pool Parking Lot Expansion & Drainage Improvements
Terminal 4 South Concourse 1 Apron
75th Avenue & ACDC Bridge
Drainage Repairs – Meridian & Roosevelt MITS
Phoenix Zoo Parking Lot – Phase II
W. Willcox TI UP Bridge
Terminal 4 North Apron Reconstruction, GMP’s 1-6 CMAR
91st Ave at MC 85 Intersection Civil Work
Gila Bend Emergency Storm Damage Repairs
Bellemont Access Safety Improvements CMAR
Post Office Canyon Bridge
Jomax Parkway Improvements
Runway 3 / 21 Reconstruction CMAR
Sedona Mill & Overlay
Tempe Town Lake LRT Bridge – Fire Damage Repair
Infrastructure for Spaceport Development Design-Build
Power Road Widening
Sunset Drive Crossing Drainage Improvements
Avondale Bus Stop (Riley & 10th Avenue)
Phoenix Zoo Parking Lot – Phase I
Jim Camp Wash & Cottonwood Wash Bridges (US 180)
Sun Valley Parkway Box Culvert Cleaning, Phases 1-3
Runway 5 / 23 Reconstruction & Electrical Upgrades
Rental Car Center Concrete – Sky Train® Stage 2
BNSF Glendale Intermodal Facility & Yard Expansion
T3 North Service Road
West Terminal Station Concrete – Sky Train® Stage 2
I-40 Cottonwood Wash EB & WB Bridges
Arizona Avenue Improvements
Rio Salado Pathway: 32nd St to SR-143
Verrado & Van Buren Improvements
Yuma – Casa Grande Highway / I-8 Araby Road T.I.
Monroe Ave Beautification, Phase 1-3 Design-Build
Drainage Improvements – Patton Road at 210th Ave
Rio Salado Pathway: Segment 3 & 4 – SR-101L to Dobson Rd
Nevitt Park Pedestrian & Bicycle Bridge
North Apron Reconstruction
LAX 2nd Level Roadway Construction CMAR
Posse Grounds Bike Skills Park
Acute Angle Connectors A6 & A8
Uptown SR89A Roadway Reconstruction CMAR
Terminal 4 South Apron Reconstruction
Taxiway Alpha Relocation & Reconstruction
Westplex Taxilane Reconstruction CMAR
SR-24 Gateway Freeway (SR-202L to Ellsworth Rd)
Airfield Safety & Drainage Enhancements, GMP 1 & 2 CMAR
South Apron Reconstruction, GMPs 1-4 Design-Build
© 2025 Banicki Construction. All Rights Reserved.