Projects
Heavy Civil
Aviation
Structures
CMAR
Design-Build
JOC
Featured
Company
About
Leadership
Sterling
Safety
Careers
News
Updates
Awards
Services
Contact
Subcontractor Portal
Projects
Heavy Civil
Aviation
Structures
CMAR
Design-Build
JOC
Featured
Company
About
Leadership
Sterling
Safety
Careers
News
Updates
Awards
Services
Contact
Subcontractor Portal
Projects
ALL PROJECTS
Heavy Civil
Structures
Aviation
CMAR
Design-Build
JOC
Featured
Airport Road TI UP (New JW Powell Blvd Bridge)
West Air Cargo Reconstruction
Schultz Creek Drainage Improvements at US Highway 180 CMAR
Stardust Trail Road Widening & Reconstruction CMAR
SR 287 & 79B Dual Roundabouts
Meridian Road – Queen Creek to Germann
Beale Street Streetscape Revitalization CMAR
MC 85 & 91st Ave Intersection: 95th Ave to 87th Ave
Schultz Creek Crossing – Mount Elden Lookout Road
OMC Guard House & Shade Canopy
Back O’ Beyond Low Water Crossing Improvements
Solano Park Skate Plaza
SRP Civil & Drainage Improvements, Phase 1-4 Design-Build
Paradise Lane at Skunk Creek
El Mirage Roadway Construction
Bloody Tanks Wash Channel Rehabilitation
Avondale Bus Stop (Van Buren & Links)
Fare Collection System Modernization (FCSM) Site Development: Work Packages #01 – #04
Hermosa Drive UP Bridge
North Gateway Transfer Station
Ancient Trail Reconstruction
Terminal 4 South Concourse 1 Apron
Drainage Repairs – Meridian & Roosevelt MITS
75th Avenue & ACDC Bridge
Phoenix Zoo Parking Lot – Phase II
Terminal 4 North Apron Reconstruction, GMP’s 1-6 CMAR
W. Willcox TI UP Bridge
91st Ave at MC 85 Intersection Civil Work
Gila Bend Emergency Storm Damage Repairs
Bellemont Access Safety Improvements CMAR
Post Office Canyon Bridge
Runway 3 / 21 Reconstruction CMAR
Jomax Parkway Improvements
Sedona Mill & Overlay
Tempe Town Lake LRT Bridge – Fire Damage Repair
Infrastructure for Spaceport Development Design-Build
Sunset Drive Crossing Drainage Improvements
Power Road Widening
Avondale Bus Stop (Riley & 10th Avenue)
Phoenix Zoo Parking Lot – Phase I
Jim Camp Wash & Cottonwood Wash Bridges (US 180)
Sun Valley Parkway Box Culvert Cleaning, Phases 1-3
Runway 5 / 23 Reconstruction & Electrical Upgrades
Rental Car Center Concrete – Sky Train® Stage 2
BNSF Glendale Intermodal Facility & Yard Expansion
T3 North Service Road
West Terminal Station Concrete – Sky Train® Stage 2
I-40 Cottonwood Wash EB & WB Bridges
Arizona Avenue Improvements
Rio Salado Pathway: 32nd St to SR-143
Verrado & Van Buren Improvements
Yuma – Casa Grande Highway / I-8 Araby Road T.I.
Monroe Ave Beautification, Phase 1-3 Design-Build
Drainage Improvements – Patton Road at 210th Ave
Rio Salado Pathway: Segment 3 & 4 – SR-101L to Dobson Rd
Nevitt Park Pedestrian & Bicycle Bridge
North Apron Reconstruction
LAX 2nd Level Roadway Construction CMAR
Posse Grounds Bike Skills Park
Acute Angle Connectors A6 & A8
Uptown SR89A Roadway Reconstruction CMAR
Terminal 4 South Apron Reconstruction
Taxiway Alpha Relocation & Reconstruction
Westplex Taxilane Reconstruction CMAR
SR-24 Gateway Freeway (SR-202L to Ellsworth Rd)
Airfield Safety & Drainage Enhancements, GMP 1 & 2 CMAR
South Apron Reconstruction, GMPs 1-4 Design-Build
© 2024 Banicki Construction. All Rights Reserved.