Westplex Taxilane Reconstruction CMAR
Client
City of Flagstaff
Location
FLAGSTAFF, ARIZONA (FLG AIRPORT)
Cost
$4.58M
Date Completed
August 2014
DESCRIPTION
This project involved the removal and reconstruction of existing taxilanes between and surrounding general aviation hangars in the Westplex area of Flagstaff Pulliam Airport. The existing asphalt pavement was in poor condition, necessitating costly annual maintenance to remain operational.
PRECONSTRUCTION SERVICES
Banicki worked closely with the City of Flagstaff and designer Kimley-Horn to revise the construction phasing and sequencing to reduce project cost and overall duration.
SCOPE
- 11,000 tons of AC pavement
- 7,100 CY of ABC
- 48,800 SY of pavement removal
- 39,475 SY of subgrade preparation
- Storm drain systems