Projects
Heavy Civil
Aviation
Structures
CMAR
Design-Build
JOC
Featured
Company
About
Leadership
Sterling
Safety
Careers
News
Updates
Awards
Services
Contact
Subcontractor Portal
Projects
Heavy Civil
Aviation
Structures
CMAR
Design-Build
JOC
Featured
Company
About
Leadership
Sterling
Safety
Careers
News
Updates
Awards
Services
Contact
Subcontractor Portal
Projects
ALL PROJECTS
Heavy Civil
Structures
Aviation
CMAR
Design-Build
JOC
Featured
Airport Road TI UP (New JW Powell Blvd Bridge)
West Air Cargo Reconstruction
CMAR: Schultz Creek Drainage Improvements at US Highway 180
Bursera Park Trailhead Parking Lot
CMAR: Stardust Trail Road Widening & Reconstruction
SR 287 & 79B Dual Roundabouts
Meridian Road – Queen Creek to Germann
Carefree Hwy & 32nd St Intersection
CMAR: Beale Street Streetscape Revitalization
MC 85 & 91st Ave Intersection: 95th Ave to 87th Ave
Schultz Creek Crossing – Mount Elden Lookout Road
Back O’ Beyond Low Water Crossing Improvements
OMC Guard House & Shade Canopy
Solano Park Skate Plaza
SRP Civil & Drainage Improvements, Phase 1-4 Design-Build
Paradise Lane at Skunk Creek
El Mirage Roadway Reconstruction
Bloody Tanks Wash Channel Rehabilitation
Avondale Bus Stop (Van Buren & Links)
Bagdad Airport Runway 5 / 23
Hermosa Drive UP Bridge
Fare Collection System Modernization (FCSM) Site Development: Work Packages #01 – #04
North Gateway Transfer Station
Ancient Trail Reconstruction
Buckeye Pool Parking Lot Expansion & Drainage Improvements
Terminal 4 South Concourse 1 Apron
Drainage Repairs – Meridian & Roosevelt MITS
75th Avenue & ACDC Bridge
Mesa Gateway Shared Use Path
Phoenix Zoo Parking Lot – Phase II
CMAR: Terminal 4 North Apron Reconstruction, GMP’s 1-6
W. Willcox TI UP Bridge
CMAR: Bellemont Access Safety Improvements
Post Office Canyon Bridge
91st Ave at MC 85 Intersection Civil Work
Gila Bend Emergency Storm Damage Repairs
CMAR: Runway 3 / 21 Reconstruction
Jomax Parkway Improvements
Sedona Mill & Overlay
Infrastructure for Spaceport Development Design-Build
Tempe Town Lake LRT Bridge – Fire Damage Repair
Power Road Widening
Sunset Drive Crossing Drainage Improvements
Avondale Bus Stop (Riley & 10th Avenue)
Jim Camp Wash & Cottonwood Wash Bridges (US 180)
Phoenix Zoo Parking Lot – Phase I
Sun Valley Parkway Box Culvert Cleaning, Phases 1-3
Runway 5 / 23 Reconstruction & Electrical Upgrades
Rental Car Center Concrete – Sky Train® Stage 2
BNSF Glendale Intermodal Facility & Yard Expansion
T3 North Service Road
West Terminal Station Concrete – Sky Train® Stage 2
I-40 Cottonwood Wash EB & WB Bridges
Arizona Avenue Improvements
Rio Salado Pathway: 32nd St to SR-143
Verrado & Van Buren Improvements
Yuma – Casa Grande Highway / I-8 Araby Road T.I.
Southwest Mesa Bicycle and Pedestrian Pathway
Monroe Ave Beautification, Phase 1-3 Design-Build
Drainage Improvements – Patton Road at 210th Ave
Prescott Valley Pipeline Multi-Use Path
Rio Salado Pathway: Segment 3 & 4 – SR-101L to Dobson Rd
Nevitt Park Pedestrian & Bicycle Bridge
CMAR: LAX 2nd Level Roadway Construction
North Apron Reconstruction
Posse Grounds Bike Skills Park
CMAR: Uptown SR89A Roadway Reconstruction
Acute Angle Connectors A6 & A8
Terminal 4 South Apron Reconstruction
Taxiway Alpha Relocation & Reconstruction
CMAR: Westplex Taxilane Reconstruction
SR-24 Gateway Freeway (SR-202L to Ellsworth Rd)
CMAR: Airfield Safety & Drainage Enhancements, GMP 1 & 2
South Apron Reconstruction, GMPs 1-4 Design-Build
© 2025 Banicki Construction. All Rights Reserved.